.
Profile Ketinggian... laluan sejauh 45km
Ride Description:
Stage 1: KLIA
Distance: 13.5km
Difficulty: Moderate - Rolling Plantation
Stage 2: Estate Crossing
Distance: 9.0km
Difficulty: Easy - Rolling Plantation
Stage 3: Twin Peaks
Distance: 12.5km
Difficulty: Hard
Stage 4: Home Run
Distance: 5.2km
Difficulty: Moderate
Total distance: 40.2km
Checkpoint Cut-Off times:
(All riders arriving at Checkpoints after cut-off will be directed to the Chicken Loop back to the carnival site)
CP1 - Closes at 10.00am , Chicken Loop distance - 5.5km
CP2 - Closes at 10.30am , Chicken Loop distance - 6.0km
CP3 - Closes at 12.30pm , Chicken Loop distance - 3.7km
All Checkpoints will have water and bananas for all riders, and Suntonic drink booth will be waiting for the riders at the finishing point.
Aturcara pada 21th November 2010 (Sunday)
6am Registration / start of Mountain Bike Jamboree
8am Competitor briefing & start of SS 8-9.
10am Start of Motorcross Enduro Race.
12pm Calculation on competition score / result.
1pm Other events prize presentation.
2pm Closing speech by YAB Dato' ABD.Khalid Ibrahim (MB Sel.D.E.)
3pm Lucky draws for Mountain Biking Jamboree participants
4pm Event closed.
Koleksi goodies yang disediakan :
Senarai sponsor Sepang Jamboree 2010
Turut disokong oleh :
No comments:
Post a Comment